SteamGen™ 8 Projects
In projects where power production is the primary requirement SteamGen™ 8 offers the best and most readily available HRSG technology on the market.
Cengiz Holding - Turkey
This plant will consist two of the most efficient HRSG after the relatively new gas turbine from GE the LMS 100. With this project Aalborg Engineering will be a part of the new and more efficient power plant type this aero derivative turbine types can offer. The selection of the SteamGen™ 8 HRSG for this plant configuration has again showed that high efficiency, availability and proven operation records for cyclic service are all very important criteria for power producers.
The contract covers design, procurement, production and commissioning of a dual-pressure HRSG.
All equipment is purchased by Aalborg Engineering and the erection work is carried out by a subcontracted Turkish company.
Project data
Client | Cengiz Holding |
Location | Cengiz, Turkey |
Year of commissioning | 2010 |
Gas turbine | GE LMS 100 |
Boiler type | SteamGen™ 8 |
HP Steam capacity | 61 t/h |
HP Steam pressure | 49 bar |
HP Steam temperature | 406 °C |
LP Steam capacity | 27 t/h |
LP Steam pressure | 3 bar |
LP Steam temperature | 221 °C |
Scope of supply
- Natural circulation, dual-pressure HRSG
- Steel structure, platforms and stairways
- Flue gas duct and stack
- Boiler feed pumps
- Steam system
- Steam turbine bypass system
- Drain, vent and blowdown system
- Chemical dosing system
- Water & steam sampling and analysis system
- Valves and instrumentation
- Instrument cable installation
- Electrical trace heating
- Motor control centre
- Boiler control system