Cengiz Holding - Turkey

This plant will consist two of the most efficient HRSG after the relatively new gas turbine from GE the LMS 100. With this project Aalborg Engineering will be a part of the new and more efficient power plant type this aero derivative turbine types can offer. The selection of the SteamGen™ 8 HRSG for this plant configuration has again showed that high efficiency, availability and proven operation records for cyclic service are all very important criteria for power producers.

The contract covers design, procurement, production and commissioning of a dual-pressure HRSG.

All equipment is purchased by Aalborg Engineering and the erection work is carried out by a subcontracted Turkish company.

Project data

Client Cengiz Holding
Location Cengiz, Turkey
Year of commissioning 2010
Gas turbine GE LMS 100
Boiler type SteamGen™ 8
HP Steam capacity 61 t/h
HP Steam pressure 49 bar
HP Steam temperature 406 °C
LP Steam capacity 27 t/h
LP Steam pressure 3 bar
LP Steam temperature 221 °C

Scope of supply

  • Natural circulation, dual-pressure HRSG
  • Steel structure, platforms and stairways
  • Flue gas duct and stack
  • Boiler feed pumps
  • Steam system
  • Steam turbine bypass system
  • Drain, vent and blowdown system
  • Chemical dosing system
  • Water & steam sampling and analysis system
  • Valves and instrumentation
  • Instrument cable installation
  • Electrical trace heating
  • Motor control centre
  • Boiler control system