E4 Group - Belarus
The existing Power plant in Borisov, 60 km from Minsk, will be reconstructed and will include the replacement of worn-out equipment to a new state-of-the-art 65MW CCPP with electrical efficiency of 49,5%. The SteamGen™ 8 will supply steam for a 20 MW Siemens steam turbine for electrical and 2 MW for district heating. The main reasons for choosing the SteamGen™ 8 solution is our higher effiency, our prior SGT 800 experience and our vertical design due to space limitations.
The contract covers design, procurement, production and supervision of commissioning of a dual-pressure HRSG.
All equipment is purchased by Aalborg Engineering.
Project data
Client | E4 Group |
Location | Borisov, Belarus |
Year of commissioning | 2013 |
Gas turbine | Siemens SGT 800 |
Boiler type | SteamGen™ 8 |
HP Steam capacity | 58 t/h |
HP Steam pressure | 83 bar |
HP Steam temperature | 513 °C |
LP Steam capacity | 12 t/h |
LP Steam pressure | 7 bar |
LP Steam temperature | 286 °C |
Download | Brochure |
Scope of supply
- Natural circulation, dual-pressure HRSG
- Steel structure, platforms and stairways
- Flue gas duct and stack
- Feed water system
- Steam system
- Drain, vent and blowdown system
- Chemical dosing system
- District heating economiser system
- Water & steam sampling and analysis system
- Valves and instrumentation
- Instrument cable installation
- Electrical trace heating
- Motor control centre
- Supervision of Commissioning