Siemens - Bulgaria
Space is a limitation in many indoor Combined Heat and Power Plants. This was also the case in Plovdiv. The smart solution var to place the HRSG on top of the gas turbine. As the end user EVN,the contractor Siemens Sweden and Aalborg Engineering could accept the arrangement this became the logic for this project. The SteamGen™ 8 was selected and with its water cooled combustion chamber the capacity was reached without any limits of the design.
All equipment is purchased by Aalborg Engineering and the erection work is carried out by a subcontracted Turkish company.
Project data
Client | Siemens Industrial Turbomachinery AB |
Location | Plovdiv, Bulgaria |
Year of commissioning | 2011 |
Gas turbine | Siemens SGT 700 |
Boiler type | SteamGen™ 8 |
Steam capacity | 75 t/h |
Steam pressure | 82,5 bar |
Steam temperature | 511 °C |
Download | Brochure |
Scope of supply
- Natural circulation, dual-pressure HRSG
- Steel structure, platforms and stairways
- Flue gas duct and stack
- Boiler feed pumps
- Steam system
- Steam turbine bypass PRDS
- Drain, vent and blowdown system
- Chemical dosing system
- Water & steam sampling and analysis system
- Valves and instrumentation
- Instrument cable installation
- Electrical trace heating
- Motor control centre
- Erection
- Commissioning